TM 9-2320-280-34
15-4. 9,000 LB. ELECTRIC WINCH REPAIR (Cont'd)
d. Assembly
1.
Position 85-87 steel balls (34) in groove of intermediate ring gear (3) and install intermediate ring
gear (3) in gear housing (11).
NOTE
Openings in retaining rings should be opposite of each other and 90
degrees from clutch lever.
2.
Install two retaining rings (28) in gear housing (11).
3.
Apply light oil to steel balls (34) through the clutch lever hole (30).
4.
Apply grease to clutch lever hole (30) and install O-ring (31) and clutch lever (1) in gear housing (11).
5.
Install detent ball (32), spring (33), and detent spacer (29) in gear housing (11).
6.
Apply aircraft grease to output ring gear (12), intermediate gear carrier (14), and output gear carrier (13)
and input gear carrier (16).
7.
Install input sun gear (15) and input gear carrier (16) in gear housing (11).
NOTE
Be sure ring gear engages in gear housing.
8.
Install gasket (35) and output ring gear (12) on gear housing (11).
9.
Install intermediate gear carrier (14) on gear housing (1).
10.
Install output gear carrier (13) on input gear carrier (16).
15-21