TM 9-2320-289-34
5-19.
TRANSMISSION INTERMEDIATE CLUTCH, CENTER SUPPORT ASSEMBLY
AND GEAR UNIT, AND REAR BAND MAINTENANCE (Cont).
NOTE
Ensure that center support-to-
reaction carrier thrust washer is
still in place before installing
center support assembly (8) into
roller clutch in reaction carrier
(21).
27. Install center support assembly (8)
into roller clutch (20) in reaction
carrier (21 ) using a counterclockwise
motion. Hold reaction carrier and
attempt to turn center support
assembly in both directions. Center
support
assembly
should
turn
counterclockwise
only.
If center
support assembly turns clockwise,
disassemble to determine problem.
f . I N S T A L L A T I O N
NOTE
Rear band (18) should be soaked
in hydraulic fluid a minimum of 15
minutes.
1.
Install rear band (18) in transmission
case (5) so that band lugs line up with
anchor pins.
TA50305
5-126