TM 9-2320-289-20
10-35. PERSONNEL HEATER CONTROL BOX REPLACEMENT (M1010).
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Materials/Parts
Both battery negative cables disconnected.
Eight pop rivets
(See paragraph 4-38)
RTV sealant (Item 41, Appendix C)
Tools/Test Equipment
90 degree angle drill
3/16 in. drill bit
a. REMOVAL
1.
Remove outside access panel from right rear ambulance body.
NOTE
Tag cables for installation.
2.
Remove 2 pushnuts (4). Remove 2 screws (5) and clamps
Disconnect 2 cables (2) from vent door control levers (6).
(3) from heater base (1).
TA50028
10-127