TM 9-2320-289-20
10-34. AIR CONDITIONER BLOWER REPLACEMENT (M1010).
This task covers:
a, Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Air conditioner cover assembly removed. (See paragraph 10-33)
a.
REMOVAL
1.
Remove cover (8) from above evaporator.
2.
Remove 12 screws (3) at insulated covers (2 and 4).
3.
Disconnect plug at blower resistor (18).
4.
Disconnect 2 wires at evaporator motor (6).
5.
Remove screw and starwasher, and remove 2 ground wires and capacitor (12) from insulated
cover (4).
TA50026
10-124