TM 9-2320-280-34
3-25. ENGINE INSTALLATION (6.5 L) (Cont'd)
34.
Install harness leads 359F/349A (8) on RPM sensor (7).
35.
Connect lead 349A (4) to leads 350B/359A/355A (5).
36.
Connect engine harness leads 33A (2) and 58B (3) to body harness leads 33A (9) and 58B (6).
37.
Connect lead 36A (13) to oil pressure sending unit (1).
38.
Install T-case indicator light ground (19) and transmission indicator light ground (18) to engine (15)
with screw (14).
39.
Install ground leads 3A (10) and 58A (11) to engine (15) with capscrew (12).
40.
Connect oil cooler supply line (16) and oil cooler return line (17) to engine (15).
41.
Connect two leads 458A (22) to leads 458C (23) and 458D (24).
42.
Install clamp (28) and body harness (27) to dipstick support bracket (25) with screw (26) and
nut (29).
43.
Connect control valve hose (30) to control valve (32) and hydro-boost (36) and tighten clamps (31)
and (35) to 10-20 lb-in. (1-2 Nm).
NOTE
Perform steps 44 and 45 for all models except M997A2 vehicles.
44.
Connect two clamps (20) with capscrew (21), washer (37), and nut (33).
45.
Connect high pressure line (38) to hydro-boost (36).
46.
Connect fuel inlet (56) and fuel outlet (57) lines to fuel filter (53) and tighten clamps (54) and (55).
47.
Connect engine harness connector (46) to time delay module (49).
48.
Connect harness connector plug (47) to protective control box (48).
49.
Apply antiseize compound to engine harness ground 3C (59) and install on body (39) with
assembled locknut (58).
50.
Install engine harness (41) on body (39) with clamp (40) and two screws (52).
51.
Install engine harness (41) on "A" beam (42) with clamp (44), capscrew (43), and nut (57).
52.
Install two rubber insulation pads (45) and (50) on "A" beam (42) and protective control box (48).
Change 2