TM 9-2320-280-34
3-25. ENGINE INST LLATION (6.5 L) (Cont'd)
A
53.
Install cable assembly (1) on throttle shaft lever (4) with accelerator cable clip (7).
54.
Install cable assembly (1) on cable bracket (2) with two nuts (8).
55.
Connect throttle return spring (3) to cable bracket (2).
NOTE
Steps 56 through 61 cover accelerator linkage adjustment.
56.
Loosen nuts (8) on cable bracket (2).
57.
Fully depress accelerator pedal.
58.
Hold throttle shaft lever (4) on injection pump (5) in full throttle position.
59.
Adjust nuts (8) up or down so cable end (6) holds throttle shaft lever (4) in full throttle position.
60.
Tighten nuts (8) connecting cable assembly (1) to cable bracket (2).
61.
Release accelerator pedal and ensure throttle shaft lever (4) returns all the way to idle position.
________
_W__NI___
_ AR _ NG
Ensure fuel pump vent line is properly attached to top vent line
fitting of fuel pump. Improper vent line installation may cause
injury to personnel or damage to equipment.
62.
Connect vent line (22) to fuel pump (19) and tighten clamp (21).
63.
Connect fuel supply line (18) to fuel pump (19) and tighten clamp (17) to 10-20 lb-in. (1-2 Nm).
64.
Connect fuel return hose (20) to fuel return line (24) and tighten clamp (23) to 10-20 lb-in. (1-2 Nm).
65.
Connect water hoses (9) to water crossover (12) and water pump (14) and tighten clamps (10).
66.
Connect water pump inlet hose (16) to water pump (14) and tighten clamp (15).
67.
Connect surge tank-to-water crossover hose (11) to crossover (12) and tighten clamp (13) to
10-20 lb-in. (1-2 Nm).
3-156
Change 1