Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-ON TASKS - TM-9-2320-289-20_666
11-10. CAB HEATER WIRING HARNESS REPLACEMENT (Cont) - TM-9-2320-289-20_668
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
641
642
643
644
645
646
647
648
649
650
651
TM 9-2320-289-20
11-10. CAB HEATER WIRING HARNESS REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Materials/Parts
•
Rear battery box removed.
•
Two
Iockwashers
(See paragraph 11-6)
•
Ten
straps
a.
REMOVAL
If removing
relay
Tag all leads and
NOTE
(2), perform step 2.
connectors for installation.
1.
Disconnect wiring harness (1) cable from cab heater control panel assembly (6). Remove 2
nuts (8) and disconnect wiring harness leads from safety switch (9). Remove screw (3),
washer (4), and clip (5). Loosen nut on strap (7) and disconnect wiring harness.
2.
Unsnap relay (2) and wiring harness (1) connector from bracket (10). Unplug
relay
(2) from
wiring harness connector.
TA50067
1 1 - 37
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business