Home
Download PDF
Order CD-ROM
Order in Print
b. INSTALLATION - TM-9-2320-289-20_387
b. lNSTALLATlON
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
362
363
364
365
366
367
368
369
370
371
372
TM 9-2320-289-20
6-12.
FRONT STABILIZER BAR AND BUSHINGS REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
MateriaislParts
ToolslTest Equipment
• Four locknuts
•
Torque
wrench
a.
REMOVAL
1.
Remove 4 locknuts (8), 8 washers (7), 2 clamps (9), and 4 bolts (8). Discard locknuts.
2.
Remove 2 bushings (10) from stabilizer bar (3). Inspect bushings for wear and discard if
damaged.
3.
Remove 2 bolts (1) and 4 washers (2). Remove stabilizer bar (3). Inspect bushings (5) for
damage. If damaged, notify your supervisor.
TA49654
6-21
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business