Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
b. INSTALLATION - TM-9-2320-289-20_299
FOLLOW-ON TASKS - TM-9-2320-289-20_301
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
274
275
276
277
278
279
280
281
282
283
284
TM 9-2320-289-20
4-28.
TAILLIGHT AND LAMP REPLACEMENT (ALL EXCEPT M1010 AND M1031).
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Tools/Test Equipment
Both battery negative cables disconnected.
Screwdriver bit set, J-29843
(See paragraph 4-38)
a.
REMOVAL
1.
Remove 4 screws (11), taillight lens (1), and gasket (3). Remove turn signal lamp (5),
back-up lamp (8), and stop lamp (10) as required.
2.
Remove 4 screws (2) and taillight housing (4).
NOTE
Tag wiring harness leads for installation.
3.
Remove turn signal lamp socket (6), back-up lamp socket (7), and stop lamp socket (9) as
required.
b.
INSTALLATION
1.
Install turn signal lamp socket (6), back-up lamp socket (7), and stop lamp socket (9) on
wiring harness if removed.
TA49891
4-55
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business