TM 9-2320-289-203-25.ENGINE IDLE SPEED ADJUSTMENT.This task covers:a. AdjustmentINITIAL SETUP:Equipment ConditionToolslTest EquipmentParking brake set.STE/lCETransmission in “P“ (Park).Manual ReferencesGeneral Safety InstructionsTM 9-4910-571-12&PUse extreme caution to ensure thatclothing or tools DO NOT get caught intruck’s operating drivebelts.WARNINGUse extreme caution to ensure that clothing,tools, and insulated jumperwires DO NOT get caught in truck’s operating drivebelts. Failure to followthis warning may result in serious injury to personnel and equipmentdamage.a.ADJUSTMENT1.Start engine and allow it to reach normal operating temperature.2.Connect STE/lCE tester to STE/lCE DCA connector under dash. (See TM 9-4910-571-12&P)3.Adjust low idle speed screw (6) onfuel injector pump (5) to 625 rpm forall except M1010 and 725 rpm forM1010.4.Remove connector (1) from fast idlesolenoid (4).CAUTIONConnecting insulated jumper wireto any terminal other than frontpositive (+) terminal will result inequipment damage.5.Use an insulated jumper wire fromfront battery positive (+) terminal toadenoid terminal (3) to energize fastidle solenoid (4).TA498183-71
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business