TM 9-2320-289-346-20.REAR SPRING ASSEMBLY AND BUSHINGS REPLACEMENT (Con’t).NOTEAll nuts (7) must be tightened evenly to ensure that “U” bolts (3) and springassembly (1) seat properly.10.Tighten 4 nuts (7) in diagonal sequence to 25 Ib.-ft. (34 N.m).Fully tighten all nuts on M1009 insame diagonal sequence to 145 Ib.-ft, (197 N.). Fully tighten all nuts on all except M1009M1028A2, and M1028A3 in same diagonal sequence to 170 Ib.-ft. (231 N.m). Fully tighten allnuts on M1028A2 and M1028A3 in same diagonal sequence to 150 Ib.-ft. (203 N.m).11.Remove jack from axle (5).FOLLOW-ON TASKS:l Install rear stabilizer bar (M1028A2 and M1028A3). (See TM 9-2320-289-20)l Install wheel. (See TM 9-2320-289-20)l Remove jack stands and lower truck.l Road test truck and check torque of “U” bolt fasteners.Change 26-141/(6-142 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business