TM 9-2320-289-2010-23A. SEATBELT ANCHORPOINT REPAIR (M1009).This task covers:a. RepairINITIAL SETUP:Too/s/Test EquipmentMaterials/Parts• General mechanic’s tool kit• Bolt, NSN 5305-00-071-2077 (1 ea)•Drill motor• Flatwasher, NSN 5310-00-809-5997• 1/2-inch drill(2 ea)• Locknut, NSN 5310-00-225-6993• Primer, NSN 8010-01-193-0517Personnel RequiredReferencesl MOS 63B (2)TM 9-2320-289-20P (Fig.166 & 167)a.REPAIR 1.2.3.4.5.6.Inside of the vehicle (driver’s side), remove the bolt that attaches the lower portion of theseatbelt to the mounting post/pillar and discard it.Outside of the vehicle, use the rear edge of the cab door opening to find the reinforcementcrossmember under the cab floor. Follow this crossmember inboard approximately 10 inchesand locate an existing 5/8-inch hole approximately 2 inches from the cab body mount.From underneath the vehicle, using the existing 5/8-hch hole as a guide, drill a 1/2-inchdiameter hole straight up through the cab floor and floormat. This new attaching hole shouldbe approximately 6 inches straight back from the rear seat mounting bolt location.If the floormat is still in the truck, cut and remove a 1 3/4-inch diameter section from the mataround the drilled hole.NOTEIf the floormat and jute backing are wet, go to step 5; if not, go to step 6.Remove floormat. When floor is dry, remove any rust with a wire brush and paint bare spotswith primer (NSN 8010-01-193-0517). Replace floormat.From inside the vehicle cab, place one hex head grade 8 bolt (1/2–inch – 13 coarse thread x3-1/2 inch long (NSN 5305-00-071-2077) through the mounting plate of the seatbelt. Plaoetwo 1/2-inch flatwashers (NSN 5310-00-809-5997) onto the bolt and install the bolt into thedrilled hole in the floor.10-90 Change 4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business