TM 9-2320-289-20
10-13. HEATER ASSEMBLY, HEATER CORE, AND HEATER HOSES REPLACEMENT
(Cont).
6.
Connect defroster cable (10) to defroster shaft (11) with spring retainer (12) and install screw
(13). Connect temperature cable (14) to temperature shaft (15) with spring retainer and install
screw.
7.
Install instrument panel compartment with 4 screws.
8.
Install hose clip (8) to inner fender. Connect outlet hose (3) to radiator (6) and inlet hose (9)
to crossover pipe (5).
9.
Connect outlet hose (3) to upper heater core tube (1) and inlet hose (9) to lower heater core
tube. Tighten 2 clamps (2) and clamps (4).
10.
Install hose clip (8) to hoses (3 and 9), and install a new strap (7) around hoses.
TA49963
10-42