TM 9-2320-289-204-5.STARTER AND STARTER RELAY REPLACEMENT (Con’t).NOTEStarter pinion tooth-to-flywheel clearance may be measured using a wiregage.4.Remove 6 bolts (25) and accesscover (27) from transmission housing(26) .Measure clearance betweenstarter pinion (24) tooth and flywheel(23). Clearance should be 0.02 in. to0.06 in. (0.50 mm to 1.50 mm). Addshims (10) as required. Install accesscover (27) with 6 bolts.5.Install bracket (4) on starter (7) andstarter shield (2) with bolt (3), washer(6), and new locknut (5). Tighten boltto 33 Ib.-ft. (45 N•m).FOLLOW-ON TASKS:Connect both battery negative cables. (See paragraph 4-38)TA498564-14
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business