TM 9-2320-289-34
APPENDIX F
GPFU INSTALLATION (M1010)
F-1.
GAS-PARTICULATE FILTER UNIT (GPFU) INSTALLATION (M1010).
This task covers:
a .
Installation
INITIAL SETUP:
Equipment Condition
Materials/Parts
l Both battery negative cables disconnected.
l Pipe sealant
(See TM 9-2320-289-20)
Tools/Test Equipment
l Snapring pliers
(Item 61, Appendix B)
NOTE
Some parts required for this installation are provided with the M1010, and
some components must be ordered through the supply system. The task
should not be attempted until all components required are available.
a .
INSTALLATION
NOTE
l All holes for mounting various items have been factory-drilled. When
mounting any item, look for predrilled holes in areas indicated.
l Ensure that pipe sealant is applied to all threaded pipe fittings.
1.
Remove screw and disconnect ground lead from upper left front corner of patient
compartment. Save ground lead and screw for later use.
F-1