TM 9-2320-289-34
5-12.
TRANSMISSION AND TORQUE CONVERTER MAINTENANCE (Cont).
10.
Install transmission support (19) with
4 bolts (20), spacers (21), washers
(22), and nuts (23). Tighten nuts to
70 Ib.-ft, (95 N.m).
11.
If installing a new or overhauled
transmission (1) or torque converter
(16), flush oil cooler in radiator, and
transmission oil cooler supply and
return pipes. (See paragraph 5-4)
FOLLOW-ON TASKS:
Connect transmission oil cooler supply and return pipes. (See paragraph 5-4)
Connect transmission linkage, (See paragraph 5-2)
Install transfer case and adapter, (See paragraph 5-21 or 5-22)
Fill transmission with hydraulic fluid. (See TM 9-2320-289-20)
TA50248
6-64