TM 9-2320-289-34
3-25. CYLINDER HEAD INSTALLATION.
This task covers:
a. Installation
INITIAL SETUP:
Equipment Condition
Materials/Parts
. Cylinder head removed. (See paragraph 3-7)
One cylinder head gasket
One Iockwasher
. Gasket sealing compound
(Item 58, Appendix B)
Tools/Test Equipment
l Torque wrench
a. INSTALLATION
NOTE
If engine is out of truck, perform steps 1-3.
1. Install dowel pins (5) if removed.
TA50685
3 - 78