TM 9-2320-289-2011-31. SIDE, WHEEL HOUSE, AND FLOOR INSULATORS REPLACEMENT (M1009).This task covers:a. Removalb. InstallationINITIAL SETUP:Equipment ConditionMaterials/Parts• Rear seat removed. (See paragraph 10-23)• Ten locknuts• RTV sealant (Item 41, Appendix C)Personnel Required• MOS 63B (2)a . R E M O V A L 1.2.3.4.5.6.7.8.NOTE• Spare tire and spare tire carrier must be removed to perform this task.• If removing wheel house insulators (1), perform step 1.• If removing molding (13) and rear floor insulators (12), perform steps 2and 3.• If removing side insulators (6), perform steps 1 and 4.• If removing front and floor insulators (17 and 22), perform steps 2 and6 through 8.Remove 40 screws (2) and 10 brackets (3) from 2 wheel house insulators (1)wheel house insulators from wheel housings.Remove 6 screws (14) and molding (13).Remove 8 screws (4), 2 brackets (5), and 2 rear floor insulators (12).Remove 6 bolts (8), 12 washers (7), and 6 locknuts (11) at 6 brackets (10).insulators (6). Discard locknuts.and removeRemove 2 sideRemove 12 screws (9) at 6 brackets (10) and remove brackets if damaged.NOTEIf wheel house insulators (1) have not been removed, perform step 6.Remove 16 screws (2) and 4 brackets (3) securing 2 wheel house insulators (1) to floorinsulator (22).Remove 4 locknuts (16), 8 washers (15), and 4 bolts (23). Remove 4 screws (18) at frontedge of floor insulator (22) and remove floor insulator. Discard locknuts.Remove 2 nuts (19), washers (20), bolts (21), and front insulator (17).11-112
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business