Home
Download PDF
Order CD-ROM
Order in Print
Section II. FRONT AND REAR AXLES MAINTENANCE
6-8. REAR AXLE SHAFT REPLACEMENT (ALL EXCEPT M1009)
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
353
354
355
356
357
358
359
360
361
362
363
TM 9-2320-289-20
6-7.
FRONT AXLE SPINDLE AND WHEEL
BEARINGS
REPLACEMENT.
This task covers:
a.
Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Materials/Parts
• Rotor and caliper mounting bracket
• Axle shaft seal
removed. (See paragraph 8-4)
• Spindle seal
• Grease (Item 26, Appendix C)
Tools/Test Equipment
•
Puller Kit
NOTE
1985-87 M1009 trucks have a spindle (6) that is 0.25 in. (6.3 mm) longer
than 1984 trucks.
To remove spindle (6), it may be necessary to tap end with plastic or
rubber mallet.
1.
Grease wheel bearing assembly (5)
and install in spindle (6). Install new
spindle seal
(4) into spindle with
sealing lips
facing outward, Install
spacer (3) onto axle shaft (1 ) with
chamfer toward axle housing. Install
new axle shaft seal (2) with lip facing
outward.
2.
Install spindle (6).
FOLLOW-ON TASKS:
• lnstall caliper mounting bracket and rotor. (See paragraph 8-4)
TA49649
6-14
Change 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business