Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
4-40. SLAVE RECEPTACLE REPLACEMENT.
4-40. SLAVE RECEPTACLE REPLACEMENT (Cont) - TM-9-2320-289-20_330
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
303
304
305
306
307
308
309
310
311
312
313
TM 9-2320-289-20
4-40.
SLAVE RECEPTACLE REPLACEMENT (Con’t).
NOTE
If
installing slave receptacle (17), perform steps 1-7.
If
installing slave receptacle cables (6 and 20), perform steps 6-8.
1.
2.
3.
4.
Install
2
mounting
nuts
(14)
if
removed.
Install
grommet
(15)
in
slave
receptacle bracket (8) if removed.
Install slave receptacle bracket (8)
with 2 “U“ nuts (7), screws (9), and
screws (16).
Install cover (18) on slave receptacle
(17) if removed.
NOTE
Ensure that 1 bolt (19) is installed through slave receptacle cover (18)
retainer cord.
5.
Install slave receptacle (17) and 2 spacers (10) with 4 bolts (19) and nuts (11).
TA49912
4-85
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business