TM 9-2320-280-34
14-6. CARGO SHELL REPLACEMENT (Cont'd)
7.
Remove two nuts (5), washers (4), screws (1), and footman loop (2) from wheelhouse (3).
8.
Remove two locknuts (16), studs (15), washers (14), snubber plates (13), mounts (12), and
bushings (11) from support tubes (10) to roof (9). Discard locknuts (16).
NOTE
Perform step 9 for M966, M966A1, M1036, M1045, M1045A1,
M1045A2, M1046, and M1046A1 TOW vehicles only.
9.
Remove assembled locknut (7) and TOW wiring harness clamp (8) from "B" pillar cover screw (6).
Discard assembled locknut (7).
10.
Remove four screws (6), washers (18), and roof (9) from "B"pillar covers (17).
11.
Remove two locknuts (25), washers (26), capscrews (27), washers (26), and support tube (21) from
right "B" pillar (22). Discard locknuts (25).
12.
Remove two locknuts (24), capscrews (19), striker plate (20), and strap bracket (23) from
right "B" pillar (22). Discard locknuts (24).
1
2
3
4
5
14-24
Change 2