TM 9-2320-280-34
3-26. ENGINE PREPARATION (6.2 L AND 6.5 L) (Cont'd)
4.
Install wiring harness bracket (1) on oil pan with two lockwashers (2) and nuts (3).
5.
Position left and right engine mount and insulator assembly (5) to engine (6) with three lock-
washers (7) and capscrews (8). Using 9/16 in. torque adapter, tighten capscrews (8) to
30-40 lb-ft (41-54 Nm).
NOTE
Perform step 6 for early production 6.2 L engine mount vehicles
only.
6.
Install starter support bracket (4) on right engine mount and insulator assembly (5) with two
lockwashers (9) and capscrews (10). Using 9/16-in. torque adapter, tighten capscrews (10) to
30-40 lb-ft (41-54 Nm).
WARNING
Starter must be supported during installation. Failure to support
starter may cause injury to personnel or damage to equipment
7.
Position shim(s) (11), if removed, and starter (12) to flywheel housing with solenoid (13) facing
outward.
8.
Slide front stud on starter (12) in bracket (4), ensuring bracket (4) is between washer (14) and starter (12).
9.
Apply thread locking sealing compound to capscrews (16). Install two washers (17) and
capscrews (16) securing starter (12) to engine (6). Tighten capscrews (16) to 30-40 lb-ft (41-54 Nm).
10.
Secure starter (12) to bracket (4) with nut (15) and washer (14). Using crowfoot, tighten
locknut (15) to 15-19 lb-ft (20-26 Nm).
NOTE
Early production 6.2 L engines were equipped with a left heat
shield. Installation is the same.
11.
Install right heat shield (18) on exhaust manifold (20) with three socket head screws (19).
Tighten socket head screws (19) to 25-33 lb-ft (34-45 Nm).
3-190
Change 2