TM 11-7440-284-14
4-91. OUT OF VEHICLE CONFIGURATION.
This task covers:
1. Component setup for field operation
2. Reinstallation for mobile operation
INITIAL SETUP
Personnel Required
Tools
Three mechanics
Adjustable pliers
Flat-tip screwdriver
Equipment Condition
8-lb sledge hammer
V e h i c l e at field operation site and
Materials/Parts
all power in OFF position.
Ground rod clamp kit
Ground rod assembly (10 feet)
Ground rod, sectional (9 feet)
ACTION
ITEM
REMARKS
LOCATION
COMPONENT SETUP FOR FIELD OPERATION
1.
Battery box (1)
Vehicle bed
Leave batteries in battery box, and
fire extinguisher installed.
Place in position.
2.
Field operation
Battery box (1)
site
Vehicle bed
3.
Leave canvas cable bag on.
Place in position.
4.
Field operation
site
5.
Radios (3)
Remove, see SB 11-131.
Vehicle bed
There are three radios to be
removed.
Place in position.
Radios (3)
Field operation
6.
site
Brass wingnut
Using pliers, remove.
7.
Vehicle bed, behind
Hardware will be used later in this
(4), Iockwasher
power distribution
box
task.
(5), ground strap
(6) and lock-
washer (7)
4-178