TM 11-7440-284-14
4-89. REMOVING FLOOR BASE.
This task covers:
Removal
INITIAL SETUP
Equipment Condition
Tools
1/2-inch box wrench
(2 required)
Fuel can and bracket removed, see
Materials/Parts
Fuel filler nozzle and bracket removed,
None
Sledge hammer and mounting brackets
Personnel Required
Two mechanics
ACTION
REMARKS
ITEM
LOCATION
NOTE
A helper will be needed outside vehicle.
Using two 12-inch box wrenches, remove.
1. Inside carrier
Screw (1), flat
There are two screws. Step 1 is
washer (2), flat
typical for both screws.
washer (3) and
nut (4)
Do step 1 again.
2.
Screw (5)
There are four brackets. Steps 1 and 2 are
Brackets (6)
3.
typical for all four brackets.
Remove.
4.
Floor base (7)
NOTE
A helper will be needed to lift and remove floor base.
Floor base (7)
5.
4-174