TM 11-7440-284-14
This task covers:
Removal
INITIAL SETUP
Personnel Required
Tools
Two mechanics
Adjustable pliers
Equipment Condition
Materials/Parts
Canvas cable bag removed,
None
ACTION
REMARKS
ITEM
LOCATION
Using pliers, remove.
Wingnut (1)
1. Generator roadside
There are two wingnuts per mount-
rail
ing plate. Step 1 is typical for both
wingnuts.
Do step 1 again.
Wingnut (2)
2.
Remove.
Mounting
3.
strip (3)
There are two mounting strips. Steps
1, 2 and 3 are typical for both mounting
strips.
Do steps 1, 2 and 3 again.
4. Generator curbside
Mounting
rail
strip (4)
Remove.
Generator (5)
5. Carrier floor
NOTE
A helper will be needed to lift and remove generator;
Generator (5)
6.
4-158