TM 9-2320-289-3410-25. AIR CONDITIONER LINES REPLACEMENT (M1010),This task covers:a. Removalb. InstallationINITIAL SETUP:Equipment ConditionMaterials/Partsl Air conditioning system discharged.• One Iockwasher(See paragraph 10-21)l Two locknutsl Four preformed packing insertsl Two tie-down straps(Item 63, Appendix B)a .REMOVAL CAUTIONEnsure that all openings and connections are immediately plugged afterdisconnection to prevent contamination of air conditioning system.NOTE• If removing air conditioner line assembly (16), perform steps 1-3.l If removing inlet line (4) or outlet line (3), perform steps 2, 4, and 5,1 .Remove bolt (18) and Iockwasher (17), and disconnect air conditioner line assembly (16) fromcompressor (5). Discard Iockwasher.2 .Disconnectairconditionerlineassembly (16) from inlet line (4) andoutlet line (3) at rear of cab. Removeand discard 2 preformed packinginserts (8) from inlet line and outletline.3 .Remove nut (10), bolt (7), and clip(9) from frame crossmember (6).Remove 2 locknuts (15), washers(14), compressor hose washers (13),and clips (12) from 2 bolts (11) onundersideo f c a b.Remove airconditionerlineassembly (16),Discard locknuts.4 .Disconnect inlet line (4) and outletline (3) from air conditioner assembly(1).Removeandd i s c a r d 2preformed packing inserts (2).TA5046210-100
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business