TM 9-2320-289-343-28. INTAKE MANIFOLD INSTALLATION.This task covers:a. InstallationINITIAL SETUP:Equipment ConditionMaterials/Partsl Intake manifold removed. (See paragraph 3-4)l Two gasketsToo/s/Test Equipmentl Torque wrencha. INSTALLATION 1. Remove manifold covers from cylinder head (8) openings.2. Install 2 new gaskets (7) on cylinder head openings, ensuring that holes are alined.NOTEIt may be necessary to loosen fuel injector pipes to properly positionfuel injector pipe clips (6). Tighten fuel injector pipe fittings to20 Ib.-ft. (27 N.m) if this Is done,Intake manifold (1) has cylinder number printed on Intake manifoldarms, Ensure that intake manifold Is installed with odd numbers on leftside.3. Install intake manifold (1). Bend lowerhalf fuel injector pipe clips (6) backinto position over intake manifoldholes. Install upper half fuel injectorpipe clips.4. Install long bolt (4), 7 short bolts (2),4 long studs (3), and 4 short studs(5). Tighten bolts and studs to30 Ib.-ft. (41 N.m) in alphabeticalsequence shown,T A 6 0 6 9 43 - 8 8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business