TM 9-2320-289-34
3-28. INTAKE MANIFOLD INSTALLATION.
This task covers:
a. Installation
INITIAL SETUP:
Equipment Condition
Materials/Parts
l Intake manifold removed. (See paragraph 3-4)
l Two gaskets
Too/s/Test Equipment
l Torque wrench
a. INSTALLATION
1. Remove manifold covers from cylinder head (8) openings.
2. Install 2 new gaskets (7) on cylinder head openings, ensuring that holes are alined.
NOTE
It may be necessary to loosen fuel injector pipes to properly position
fuel injector pipe clips (6). Tighten fuel injector pipe fittings to
20 Ib.-ft. (27 N.m) if this Is done,
Intake manifold (1) has cylinder number printed on Intake manifold
arms, Ensure that intake manifold Is installed with odd numbers on left
side.
3. Install intake manifold (1). Bend lower
half fuel injector pipe clips (6) back
into position over intake manifold
holes. Install upper half fuel injector
pipe clips.
4. Install long bolt (4), 7 short bolts (2),
4 long studs (3), and 4 short studs
(5). Tighten bolts and studs to
30 Ib.-ft. (41 N.m) in alphabetical
sequence shown,
T A 6 0 6 9 4
3 - 8 8