TM 9-2320-289-20
11-21. CARGO COMPARTMENT HEATER AND FUEL FILTER MAINTENANCE (M1008
AND M1008A1) (Cont).
4.
Connect exhaust pipe (7) to adapter
(9) and tighten clamp (8).
5.
Connect air duct hose (3) to ventilator (6) and tighten clamp (4).
6.
Connect fuel line to fuel shutoff valve (2) and tighten fitting (1).
FOLLOW-ON TASKS:
Install communications rack mounting hardware and ground strap if removed. (See
paragraph 4-48)
Install heater control box, lead, and shield. (See paragraph 11-20)
Bleed heater. (See paragraph 11-22)
TA50105
11-79