4-25. PREPARATION FOR DRILLING FRONT REINFORCEMENT SUPPORT MOUNTING HOLES. (CONT)
ACTION
REMARKS
ITEM
LOCATION
Place support between forward wall and table
Forward carrier
Reinforcement
5.
and aline holes.
wall
support (1)
Install,
handtighten.
Screws (2),
6.
There are two screws. Step 6 is
flat washer (3),
typical for both screws.
flat washer (4)
and nut (5)
Do step 6 again.
Screw hole (6)
7.
Install, handtighten.
Screw (7),
8.
There are four screws. Step 8 is
flat washer (8),
typical for all four screws.
flat washer (9)
and nut (10)
Do step 8 again.
Screw holes (11)
9.
Using two 7/16-inch box wrenches, tighten.
Screws (2)
10.
Using two 1/2-inch box wrenches, tighten.
11.
Screws (7)
Using pencil, mark.
Mark (12)
Under reinforcement
12.
Mark in center of slotted holes
support
There are four holes. Step 12 is
typical for all four holes.
Do step 12 again.
Mark (13)
13.