TM 9-2320-289-2011-33. DOMELIGHT AND WIRING HARNESS REPLACEMENT (M1008 AND M1008A1).This task covers:a. Removalb. InstallationINITIAL SETUP:Equipment ConditionMaterials/Parts• Both battery negative cables disconnected.• One locknut (M1008)(See paragraph 4-38)a.REMOVAL1.2.3.4.5.6.7.8.9.10.11.NOTEIf removing domelight, perform steps 1-5.If removing 2 bulbs (25), 2 lenses (26perform steps 4 and 5.If removing wiring harness (12) andsteps 6-14.and 29), or cover plate (28),electrical lead (3), performRemove 4 screwsRemove 6 screwsRemove blue lensassembly (24).(2) and roof support bracket(27) and cover plate (28).(29) and clear lens (26) fromDisconnect electrical lead (3) from connector (22) at ceiling.Remove 4 nuts (23) and roof support bracket (30) from front and rear roof supports (1).(30) from base assembly (24).cover plate (28) and 2 bulbs (25) from baseNOTETag wires for installation.Disconnect purple wire (18) from “DOME” and orange wire (16) from “T-LPS” positions onfuse box (17) under dash.Remove grommet (15) at bulkhead and carefully pull wiring harness (12) through bulkhead.Discard grommet if damaged.Remove 5 screws (14), clamps (13), and wiring harness (12) from under hood and alongframe.Disconnect wiring harness (12) from electrical lead (3) at connector at front of cargo box.Remove 2 screws (6), washers (5), and clamps (20), and remove wiring harness (12) fromfront of cargo box.Remove screw (7) and locknut (8) from ground wire (10) (M1008), or nut (9) from stud (11),and remove ground wire (10) and communications rack ground strap (M1008A1). Discardlocknut.11-122
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business