TM 9-2320-289-20
11-32. ROOF PANELS AND SUPPORTS REPLACEMENT (M1008 AND M1008A1)
(Cont).
6.
7.
8.
9.
10.
11.
12.
13.
14.
Install 3 roof support brackets (9) to panel assembly (10) with 6 nuts (11).
Place roof support bracket (3) through 2 roof panels (8) and air inlet adapter assembly (6).
Loosely install 2 nuts (7) but DO NOT tighten.
Place 2 roof support brackets (13) through 2 roof panels (8). DO NOT install 4 nuts (17).
At front edge of 2 roof panels (8), install 2 bolts (12), retaining straps (4), and nuts (5).
Install slotted end of rear support (2) into
support to center bow support (1).
Install slotted end of front support (15) to air
support to center bow support (1).
panel assembly (10). Raise forward end of rear
inlet adapter assembly (6). Raise rear end of front
Install roof support bracket (18) with attached domelight with 4 nuts (17).
Tighten 2 nuts (7) at air inlet adapter assembly (6).
Install domelight wiring harness clips (14) to front support (15) and connect domelight wiring
harness connector (16) at ceiling.
FOLLOW-ON TASKS:
Install cargo cover insulator. (See paragraph 11-27)
Connect both battery negative cables. (See paragraph 4-38)
11-121