Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
b. INSTALLATION - TM-9-2320-289-20_546
10-17.1. INSTRUMENT PAD REPLACEMENT
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
521
522
523
524
525
526
527
528
529
530
531
TM 9-2320-289-20
10-17. SHELTER TIE-DOWN REPLACEMENT (M1028) (Con’t).
6.
Install new nut (13) if removed. Install
brace (3) with bolt (1). DO NOT fully
tighten bolt.
7.
Install bolt (7) and nut (2). Tighten
nut to 30-45 Ib.-ft. (41-61
N•m).
Tighten bolt (1).
NOTE
Hold bolt (4) while tightening nut
(10) to keep bolt from turning.
8.
Install reinforcement (8), 2 nuts (9),
and
nut
(10).
Tighten
nuts
to
50-65 Ib.-ft. (68-88 N•m).
TA49971
10-54
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business