TM 9-2320-289-203-34.T H E R M O S T A T , W A T E R O U T L E T , A N D C R O S S O V E R P I P E H O U S I NGREPLACEMENT (Con’t).9.Remove clamp (22) and crankcasedepression regulator valve hose (21)from oil filler neck (23).NOTEIn order to perform step 10, itmay be necessary to remove aircleaner. (See paragraph 3-9)Nut described in step 10 islocated on right side of cylinderblock in M1010.10.On left side, remove nut fromalternator ground wires from pointwhere crossover pipe (6 or 15)attaches to cylinder block.11.Remove 2 studs (16) and 2 bolts (13) from crossover pipe (6 or 15) at attachments to left andright cylinder head. Remove crossover pipe and 2 gaskets (14). Discard gaskets.b.INSTALLATIONNOTEEnsure that all gaskets and mating surfaces are clean.If installing thermostat assembly (11) and water outlet (10), performsteps 11-14.1.Install 2 new gaskets (14) andcrossover pipe (6 or 15) with 2 studs(16) and bolts (13).NOTENut described in step 2 is locatedon right side of cylinder block inM1010.2.On left side,install nut securingalternator ground wires at point wherecrossover pipe (6 or 15) attaches tocylinder block.3.Install crankcase depression regulatorvalve hose (21) to oil filler neck (23)with clamp (22).TA498403-102
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business