TM 9-2320-280-34
3-23. ENGINE INSTALLATION (6.2 L AND 6.5 L [DETUNED]) (Cont'd)
28.
Connect kick-down connector lead 315C (11) to transmission (8).
29.
Install connector lead 315C (14) and speedometer cable (13) on transmission (8) with clamp (10)
and screw (12).
30.
Install lead 315C (14) on stud (18) on transmission (8) with clamp (17), lockwasher (16), and nut (15).
31.
Connect harness connector 7 (3) to rpm sensor (2).
32.
Install STE/ICE-R harness leads (9) on stud (4) on transmission (8) with clamp (5), lockwasher (6),
and nut (7).
33.
Apply antiseize compound to ground leads 3A (20) and 58A (21) and install on left cylinder head (19)
with capscrew (1).
34.
Connect transfer case indicator lamp ground leads (23) on cylinder head (19) with screw (22).
35.
Connect engine harness leads 33B (32) and 58A (24) to body harness leads 33A (26) and 58B (25).
36.
Connect lead 36A (27) to oil pressure sending unit (31).
37.
Connect oil cooler supply line (29) and oil cooler return line (30) to engine (28).
3-90
Change 2