TM 11-7440-284-14
This task covers:
Installation
INITIAL SETUP
Personnel Required
Tools
One mechanic
1/2-inch box wrench
(2 required)
Equipment Condition
Materials/Parts
Electronic equipment table
in place.
Key generator rack
5/16-24 x 2 1/4 inch long
screw (4 required)
5/16-inch flat washer
(8 required)
5/16-24 elastic stop nut
(4 required)
ACTION
REMARKS
ITEM
LOCATION
Key generator
1. Top of electronic
rack (1) and
tronic equipment table and aline mounting
equipment table in
holes.
roadside position
electronic
equipment
table (2)
Install,
handtighten.
Screw (3),
2.
flat washer (4),
There are four screws. Step 2 is
typical of all four screws.
flat washer (5)
and elastic stop
nut (6)
Do step 2 again.
Holes (7)
3.
Using two 1/2-inch box wrenches, tighten.
4.
Screws (3) and
elastic stop
nuts (6)
4-60