b e drawn from stock or through the managing
b. Hardware required for installation of items in
activity having supply responsibility.
the truck are listed in table 2. Hardware items will
Qty
FSN
Nomenclature
Application
NUT, PLAIN, HEXAGON: S, cd-pltd, semi-finished,
27
5310-732-0560
w / chromate, -20UNF-2B, 0.736 w, 0.427 h
NUT, PLAIN, HEXAGON : S, cd-pltd, semi-finished,
10
5310-763-8905
W / chromate,
-18UNF-2B, 15/16 w, 35/64 h
SCREW, CAP, HEXAGON HEAD: S, cd-pltd,
20UNF-
5305-719-5238
8
Frame (lb), Front channel (lc)
2A, 2 lg
SCREW, CAP, HEXAGON HEAD: S, cd-pltd,
18UNF-
5305-726-2551
10
2A, 2 lg
SCREW, CAP, HEXAGON HEAD: S, cd-pltd,
5305-719-5219
4
w / chromate.
-20UNF-2A. 1
Ig
SCREW, CAP, HEXAGON HEAD: S, cd-pltd,
5305-719-5221
15
WASHER, FLAT: S, rd, cd-pltd, 9/16 id, 1.375 od, 0.086
5310-809-3079
8
thk
5310-809-5998
8
0.074 thk
5310-823-8803
10
3/32thk
10
5310-045-5001
19
5310-834-7606
11/64 thk
--..--_
c. Unused space in the truck may be utilized f o r
four 9/16-inch inside diameter flat washers 5310-
809-3079, and four -20 hexagon plain nuts 5310-
transporting and storing other tools, etc.
732-0560.
3. Truck. a. Superstructure, Hoist 3950-343-9966
(2) Cross, C h a n n e l F r o n t 3 9 5 0 - 0 9 1 - 9 6 9 0
(designated as 1) (Figs. 1, 2 and 31. Superstructure
(designated as lt). P o s i t i o n front channel (lc)
is shipped disassembled. It consist of one each of
parallel to and 80-inches from frame (lb), as shown
five components designated la, lb. lc, ld, and le.
and drill four 21/32-inch holes.
(1) Frame Arch With Fittings 3950-357-5935
The holes are 5-inches and 9-inches from each
( d e s i g n a t e d as lb). Position the superstructure on
end of channel. Secure the front channel (lc) to the
the truck body, with the rear edge of the frame arch
body floor using the following components from
(lb) 4 - inches from the tailgate and centered on
installation kit (la): frame filler block, two U bolts
the floor of the body, as shown in figure 1. Mark
5/8- 18NF-3, four wshers, and four nuts. Mark and
and drill two 17/32-inch holes. One hole is 28-
drill on front channel (lt) four 17/32-inch holes.
inches from the right side of truck and the other
Each set of holes are two inches from end of front
channel and 1-inches from each side. Secure
h o l e is 28-inches from the left side. Secure the
frame (lb) to the truck using frame filler block. 1%-
front channel (1c) with four -20 x 2-inch hexagon-
13 x 9- inch bolts, washers, and nuts provided in
head cap screws 5305-719-5238, four 9/16-inch
kit. installation s u p e r s t r u c t u r e 3 9 5 0 - 4 4 9 - 7 8 5 8
i n s i d e diameter flat washers 5310-809-3079, and
( d e s i g n a t e d as la). Mark and drill on channel of
four -20 hexagon plain nuts 5310-357-8128
frame (lb) four 17/32-inch holes. Each set of holes
(3) Track, Beam Assembly 3950-357-8128
are two inches from end of frame and 1-inches
(designated as ld). Position curved end of track (ld)
from each side. Secure frame (lb) with four -20 x
f l u s h to and on front channel (lc) as shown in
2 - i n c h hexagon-head cap screws 5305-719-5238,
2