TM 9-2320-289-3410-19. PERSONNEL HEATER CONTROL BOX REPAIR (M1010) (Con’t).NOTEEnsure that cables and circuit breaker lead (19) are placed through theirappropriate holes as cover (2) and control wrap (10) are assembled.13.Assemble cover (2) and control wrap(10) and install 8 screws (1).FOLLOW-ON TASKS:l Install personnel heater control box. (See TM 9-2320-289-20)TA5044210-73
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business