TM 9-2320-289-34
9-2.
GENERAL.
a. General frame maintenance procedures can be found in TB 9-2300-257-40. References
to 3/4 ton and 1 1/4 ton truck apply to CUCV Series trucks.
b. Perform FRAME MEASUREMENT in paragraph 9-3 to determine if any adjustments need
to be made to f fame dimensions.
c. Perform FRAME REPAIR in paragraph 9-4 to repair any defects discovered in frame
assembly.
9-2