TM 9-2320-289-343-29. ENGINE AND ENGINE MOUNT INSTALLATION (Con’t).4.Install new engine mount (6) with 3washers, bolts, and new locknuts ifremoved.Install spacer (3) andengine mount bracket (2) with 3washers (8) and bolts (7) if removed,Tighten engine mount locknuts to30 Ib.-ft. (41 N.m). Tighten enginemount bracket bolts to 35 Ib.-ft.(47 N.m). Lower side of engine (4)and remove jack. Repeat for otherside.5. Install screw (1) through left sideengine mount bracket (2) and enginemount (6). Install new locknut (5).Tightenl o c k n u t t o55 Ib.-ft.(75 Nom). Repeat this step for rightside. Remove engine lifting device.CAUTIONEnsure that torque converter (13)is flush against flywheel (12) andable to rotate freely by hand.Failure to follow this caution willresult in damage to engine (4) andtransmission.6.Ailne marks made during removal on flywheel (12) and torque converter (13). Rotate flywheeland install 6 bolts (11) to fiywheel and torque converter finger tight only. Once all bolts areinstalled, tighten to 50 ib.-ft. (68 N.m).3 - 94T A 5 0 6 9 9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business