Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Section Il. MAINTENANCE ALLOCATION CHART - Continued - TM-9-2320-289-20_782
Section Il. MAINTENANCE ALLOCATION CHART - Continued - TM-9-2320-289-20_784
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
757
758
759
760
761
762
763
764
765
766
767
TM 9-2320-289-20
Section lI.
MAINTENANCE ALLOCATION CHART - Continued
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance
Level
Unit
lnter-
mectiate
Depot
Group
Maintenance
-
Tools
and
Number
Component
lAssemb
Iy
Function
c
o
F
H
~
Equipment
Remarks
0311
ENGINE
STARTING
AIDS
(PLUG
ASSY,
GLOW)
INSPEC7”
0,2
REPLACE
0,4
1,2
(SENSOR,
GLOW
INSPECT
0.1
PLUG)
REPLACE
0.3
1!4
0312
ACCELERATOR
LINKAGE
INSPECT
0.1
REPLACE
1.2
1
,2.4
SOLENOID
ASSY
INSPECT
0,2
ADJUST
0.1
1.4
REPLACE
0.5
1
,2,4
04
EXHAUST
SYSTEM
0401
MUFFLERS
,
PIPES,
INSPECT
0.1
BRKTS
REPLACE
1.0
1
,2,4
05
COOLING
SYSTEM
0501
RESERVOIR,
COOL
INSPECT
0.1
REPLACE
0.5
1,2
RADIATOR
ASSY
INSPECT
01
TEST
0.1
SERVICE
0.5
1,2
REPLACE
1.5
1.2,6
REPAIR
1.3
1
,2,6
PROBE
ASSY,
LOW
INSPECT
0,1
COOLANT
REPLACE
0.4
1,2
0502
SHROUD,
FAN
RDTR
INSPECT
0.1
REPLACE
1.0
1.2
B-8
Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business