Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Section Il. MAINTENANCE ALLOCATION CHART
Section Il. MAINTENANCE ALLOCATION CHART - Continued - TM-9-2320-289-20_781
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
754
755
756
757
758
759
760
761
762
763
764
TM 9-2320-289-20
Section Il. MAINTENANCE ALLOCATION CHART - Continued
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance
Level
Unit
inter-
mediate
Depot
Group
Maintenance
Tools
and
Number
ComponentlAssembly
Function
c
o
F
H
D
Equipment Remarks
0104
PISTON,
CONNROD
(CONNROD,
PSTN)
INSPECT
0.5
REPLACE
4.0
1,2,4,6
A
(PSTN,
INTERNAL
INSPECT
0.5
COMBUSTION
)
REPLACE
2.0
1,4,6
A
0105
CAMSHAFT,
VALVES,
TIMING
SYSTEM
(CMSHFT,
ENG)
INSPECT
0.5
REPLACE
3.0
1,2,6,10
(COVER,
VALVE)
INSPECT
0.1
0.1
REPLACE
1.2
1,4
(ROCKER
ARM)
INSPECT
0.5
REPLACE
1.0
1,2,6
(VALVE,
EXH
&
INL)
INSPECT
0.5
REPLACE
1.0
1,2,6
REPAIR
0.6
1,6
(SPROCKET,
CSHAFT)
REPLACE
0.6
1,4,6
(GEAR,
F/lNJ
PMP
DR)
INSPECT
0.2
REPLACE
0,8
1,4,6
(CHAIN,
CMSHFT
TM G)
INSPECT
0.5
REPLACE
1.0
1,4,6
0106
ENGINE
LUBRICATION
SYSTEM
TUBE
ASSY
&
SEAL,
01 L
INSPECT
0.1
LVL
INDICATOR
REPLACE
0.3
1,2
Change 1
B-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business