Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
11-17. ENGINE COOLANT HEATER WIRING HARNESS REPLACEMENT
11-18. ENGINE COOLANT HEATER EXHAUST PIPE REPLACEMENT
/.25ton/TM-9-2320-289-20 CUCV Series Trucks at Unit level Manual
Page Navigation
666
667
668
669
670
671
672
673
674
675
676
TM 9-2320-289-20
11-17. ENGINE COOLANT HEATER WIRING HARNESS REPLACEMENT (Con’t).
b.
INSTALLATION
1.
2.
3.
4.
Install grommet (3)
through bulkhead.
NOTE
If installing
relay
(10), perform step 2.
on wiring harness (2). Position wiring harness in cab. Push wiring harness
Plug
relay
(10) into wiring harness (2) and connect to mount.
Position wiring harness (2) in strap (9) and tighten nut. Connect wiring harness to cab heater
control panel assembly (8).
Connect wiring harness connector (6) to cab heater connector (7). Connect wiring harness (2)
to engine coolant heater (1). Install engine coolant heater cover. Connect wiring harness
connector (5) to engine coolant heater thermostat (4). Install new tie-down straps to wiring
harness.
FOLLOW-ON TASKS:
• Connect both battery negative cables. (See paragraph 4-38)
• Check operation of engine coolant heater. (See TM 9-2320-289-10)
TA50090
11-63
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business