TM 9-2320-289-20ternNo.678Table 2-1. Unit Level Preventive Maintenance Checks and Services for CUCV’IntervalAnnualAnnualAnnualItem To BeInspectedFrontWheelBearingsand HubsContinuedEngineStarterProcedurea. Remove locking hubs (see para-graph 8-3). Clean and inspect for dam-age.b. Remove, clean, dry, and inspect frontwheel bearings.c. Repack front wheel bearings withGAA and install.cl. Install locking hubs (see paragraph8-3).NOTEThe rear wheel bearings cm all exceptM1009 do not require routine repack-ing of the rear wheel bearings. Theyare Iubricated by the rear differentialfluid.They should only require repacting ifthe drum is turned during brake re-placement or if contaminated after dis-assembly.Inspect for loose, cracked, or damagedengine mounts, expansion plugs, crank-shaft pulley, and torsion damper. If en-gine mount retaining bolts are loose,tighten to 85 ft-lbs (115 N.m). If any ofthese components are cracked or dam-aged, notify your supervisor.a. Inspect starter mounting bolts to en-sure that none are loose or missing. Ifloose, tighten to 33 ft-lbs (45 N.m).b. Inspect starter wiring connections forlooseness.Not MissionCapable If:a. Any damage thatwill prevent opera-tion.Enginemountscracked, damaged.Any damage that willpreventoperation.Class Ill leak.a. Mountingboltmissing, broken orloose.b. Stud nut loose.2-24.1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business