TM 9-2320-289-20Table 2-1. Unit Level Preventive Maintenance Checks And Services for CUCVternIntervalItem To BeProcedureNot MissionNo.InspectedCapable If:20Semi-Tires(1) Loosen Iugnuts on left sideAnnualwheels. Raise truck and remove leftContinuedside tires (see paragraph 8-2). Posi-tion front tire on rear wheel hub andrear tire on front wheel hub, and fin-ger tighten lugnuts. Lower truck andfully tighten Iugnuts (see paragraph8-2).(2) Repeat previous steps for rightside tires.b. Rotate tires as follows for M1028A2and M1028A3 only:M1028A2(1) Loosen Iugnuts on left sidewheels. Raise truck and remove leftside tires (see paragraph 8-2). Posi-tion rear outer tire on rear inner hub,front tire on rear outer hub, and rearinner tire on front hub and fingertighten lugnuts. Lower truck and fullytighten Iugnuts (see paragraph 8-2).(2) Repeat previous steps for rightside tires.c. Ensure all wheel Iugnuts are presentc. Any broken stud orand tightened to 90 Ibs. for M1009 andmissing Iugnut.140 Ibs. for all except M1009.2-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business