TM 55-2320-242-15-1
Figure 4-5. Diagram of the M561 rigged with universal cargo sling set.
Tiedown
Capacity of fitting
Type
fitting No.
in 1,000 lb
device
Attach to item
B8/D9
5
CGU-1/B
Around right front tractor suspension arm
B9/D8
5
CGU-1/B
Around left front tractor suspension arm
B10
5
CGU-1/'B
Left front tiedown clevis
D10
5
CGU-1/B
Right front tiedown clevis
4-15. Load 8-Internal Air Transport of the M561
(2) Two men can unload the vehicle in 10
Without Lockout Truss Kit in US Army CH-54
minutes.
c. Loading Procedures.
a. Materials.
(1) Place the parking shoring on each side of
(1) Parking shoring, two each-2x 12-inch x
the cargo compartment to match the wheel width of the
20-foot lumber.
vehicle.
(2) 14 CGU-1/B tiedown devices (FSN 1670-
(2) Back the vehicle into the pod and onto the
725-1437).
parking shoring to the location indicated in figure 4-9.
b. Personnel.
(3) Set brakes, place vehicle in gear, and tie
(1) Two men can accomplish loading and
tiedown in 25 minutes.
4-7