TM 11-7440-284-14
4-8. FRONT ANTENNA BRACKET MOUNTING HOLES.
This task covers:
INITIAL SETUP
Personnel Required
Tools
Two mechanics
C-clamps (2 required)
White marking pencil
Equipment Condition
Materials/Parts
Tie-down hooks removed and
ACTION
REMARKS
ITEM
LOCATION
Aline.
Inner spacer (1)
1. Outside carrier,
and bow socket (2)
front corners
Push bracket up so spacers are under wall
Outer spacers (3)
2.
lip.
and carrier wall
lip (4)
Using two C-clamps, clamp both sides of
C-clamp (5) and
3.
bracket to wall.
bracket (6)
Using marking pencil, mark.
Screw hole (7)
4.
There are 16 screw holes. Step 4 is
typical for all 16 holes.
Do step 4 again.
Screw hole (8)
5.
Remove.
6.
C-clamps (5) and
bracket (6)
4-10