TM 9-2320-289-20
10-19. CARGO COVER AND FRAME MAINTENANCE (M1008 AND M1008A1 ) (Cont).
CAUTION
DO NOT overtighten bolts (24) in nuts (26) or nuts will break.
NOTE
If installing side rail assemblies (10), perform steps 1 and 11.
If installing rear rail assembly (12), perform steps 2, 3, and 13.
If installing front rail assemblies (23), perform steps 4, 5, and 13.
If installing cargo cover frame assembly components,
perform
steps 5-15.
If installing cargo cover, perform steps 12-15.
1.
Apply RTV sealant and install side rail assembly (10) with 2 bolts (24), washers (25), and nuts
(26). Be careful to install each side rail assembly so that built-in handles are at front and rear
corners.
2.
Install 4 new tube anchor nuts (28) in endgate as required.
3.
Apply RTV sealant and install rear rail assembly (12) with 4 bolts (27).
4.
Install 2 new tube anchor nuts (28) as required. Apply RTV sealant and install front rail
assembly (23) with 2 bolts (27).
TA49982
1 0 - 6 5